← All Coweta County cases · Every Atlanta P&Z portal we watch
25-022 — Parts distribution facility - 784,700 square-foot warehouse building, approximately 60 feet in height, serving Yamaha's nearby manufacturing operations in Coweta County, GA
DHL Supply Chain seeks a variance from the Highway 34 East Quality Development Corridor District (QDCD) architectural standards, which require 80% Category A materials (brick, stone, glass) on building exteriors. The applicant proposes primarily painted tilt wall panels with minimal glazing, claiming the required materials are costly and inefficient for warehouse construction. The project triggers significant conditions including dedicated turn lanes on Interstate Way and Lakeside Way at SR 34, pedestrian connectivity requirements, and utility connections.
| Case number | 25-022 |
|---|---|
| Type | Variance |
| Location | Northeast intersection of Interstate Way and Highway 34 East, Coweta County, GA |
| County | Coweta County |
| Parcel / legal | Tax ID #097-5078-001 (partial) |
| Acreage | 51.352 |
| Current zoning | M (Industrial) |
| Proposed use | Parts distribution facility - 784,700 square-foot warehouse building, approximately 60 feet in height, serving Yamaha's nearby manufacturing operations |
| Petitioner | DHL Supply Chain (USA) |
| Hearing | 2026-01-29 |
| Hearing body | Board of Adjustment |
| Status | new |
The summary and fields above are read automatically from the agenda packet, so they can be wrong or incomplete — the packet itself is the record. Tell us if something here is wrong.
Property & nearby activity
Case history
Every time this case appeared on an agenda we watched, and what changed.
- First seen — 2026-07-26: First seen on an agenda (backfilled from our archive) · Board of Adjustment
Also on the 2026-01-29 Coweta County agenda
- 25-016 — 784,700-SF warehouse building
- CD-25-073 — Warehouse/distribution facility (extension of Yamaha Manufacturing campus)
- 25-030 — Barn (60 feet by 52 feet)